Cortyard by Marriott Heathrow

We were called to the Marriott at Heathrow when the contractor who was installing was having issues with mirror breakage and faults on the LED lights, on arrival we surveyed the hotel and realised there were several issues with the design, the largest of which was that not enough allowance had been made for the the back mirrors in the alcove. We remeasured and the alcoves and arranged for the remaining shipments of mirrors to be reduced in size, we removed the existing installed mirrors and refit the LED’s then completed the installation.

Project type: Hotel

Project location: Heathrow

Clients: Main contractor

Time on site: 4 weeks

Items installed: 350